Welcome! Log In

Advanced

Drop Cost wrong?

Drop Cost wrong?
August 30, 2018 05:43PM
New player so, any mistake possible here.

I have set the cost for Enm to 28.9 pec, do only this and get drop cost of 2,89 ped, PEC vs PED.

Any idea?

Again in more steps:

LBML config
  • Ore: 54;33.9
  • Enm 54; 28.9
  • Tre 54;0
  • Min: 0
  • Avg: 0
  • Max: 0

I start a new run.
I only use [Omegaton Detectonator MD-1 (L)] once with one scan for "Energy Matter", cost: 1 Survey Probe.
I get a drop cost (from 0) of 2,89 ped.

Any idea?
Ido
Re: Drop Cost wrong?
August 31, 2018 12:14AM
Maybe . Vs , ?

Re: Drop Cost wrong?
August 31, 2018 03:39AM
Quote
Ido
Maybe . Vs , ?

Meaning?

I mean, you can calculate it, right?

1 x one number gives what? Another number?

It can't be I am the only one looking at the numbers and it can't be the program is wrong after so long.
So... there must be something to setup/configure/know, so that these numbers make sense.

Or are all of you just looking at the map and say.."numbers? wut?" Not really, right? Please???



Edited 2 time(s). Last edit at 08/31/2018 03:42AM by Phin Lazy Harrington.
Ido
Re: Drop Cost wrong?
August 31, 2018 01:45PM
What is your systems configured decimal point? 289 pec is 2.89 ped. If you use the wrong decimal point maybe the program ignores it?